If it was known 3 years back that their are tell tail signs that a big slide can occur then why not FWO had developed a concrete pipe tunnel along the river so that in case of such incident water would have been under flowing condition
I red the draft report of FOCUS. The report clearly demands urgent attention of the government to clear the debris for early flow of water. It is generaly noticed that the required attention is not paying by the FWO. Which created a high risk of flood in river Hunza for the vilages fall on down stream of the river. The people of Hunza urges upon the government to direct the FWO clear the debris as soon as possible.
I read the information provided sofar. It is great achevivement from your end. I appreciate your for job. I suggest you to include videos and photographs to keep the reader well informed.
Making of immediate emergency spillway using control blasting would have been saved lot of loss
There is not a problem of water tide doing any thing wrong to Tarbela lake, it is the sediment which will do long term harm to the Tarbela lake
If it was known 3 years back that their are tell tail signs that a big slide can occur then why not FWO had developed a concrete pipe tunnel along the river so that in case of such incident water would have been under flowing condition
I red the draft report of FOCUS. The report clearly demands urgent attention of the government to clear the debris for early flow of water. It is generaly noticed that the required attention is not paying by the FWO. Which created a high risk of flood in river Hunza for the vilages fall on down stream of the river. The people of Hunza urges upon the government to direct the FWO clear the debris as soon as possible.
updates are required.
I read the information provided sofar. It is great achevivement from your end. I appreciate your for job. I suggest you to include videos and photographs to keep the reader well informed.